Production planning

Production planning that keeps up with the shop floor

EpoSystem sequences work across every stage, reserves the materials each job needs, and shows which orders are at risk — recalculating as reality changes rather than at the end of the week.

Plans across
Every workflow stage
Recalculates
When anything changes
Forecasts
Weeks of capacity ahead
The situation

What planning has to survive

A production plan is accurate when it is written. These are the things that change it, usually before lunch.

A machine stops

Everything queued behind it moves, and so does every promise that depended on those dates.

A delivery slips

Work that was ready to start is not, and the people assigned to it need something else to do today.

Someone is absent

A stage that needs a specific qualification suddenly has no one who holds it.

An urgent order arrives

It has to fit somewhere, and something else has to give — the question is what, and whether the customer needs telling.

Production control board with every active project and its current stage
The control board: every active project, and where it actually is.
How it works

From order to schedule

  1. Your workflow, described once

    Define the stages an order passes through and which roles may run each one. Every project follows that flow afterwards.

  2. Work sequenced by real capacity

    Jobs are ordered by who is qualified and available, which machines are free, and what materials have arrived — not by the dates anyone hoped for.

  3. Materials reserved to the job that needs them first

    Stock is committed to a specific job, so two orders cannot both be planned around the same parts.

  4. Risk surfaced while it is still early

    Orders that will not make their date are flagged in advance, with the reason — a missing part, a full stage, an absent qualification.

  5. The plan follows reality

    When something changes on the floor, the schedule updates. Nobody has to rebuild it by hand.

Unit overview with per-unit workflow timelines and completion percentages
Each unit on its own timeline, so a stage that slips is visible at once.
Capacity

Answer the next-order question from the plan

The hardest question in manufacturing is whether to accept the next order. EpoSystem forecasts workload per team and per machine, so the answer comes from the schedule rather than from instinct.

  • Workload per team and per machine, weeks ahead
  • Predicted finish date for every project
  • Delivery confidence, so you know which dates are safe to promise
  • Overload visible before it becomes overtime
  • Holidays, shifts and absences included automatically
Workload per team with capacity and overload highlighted week by week
Workload per team, weeks ahead — overload visible before it becomes overtime.
FAQ

Frequently asked questions

Is this an APS system?

Yes — EpoSystem includes advanced planning and scheduling. The difference from a standalone APS tool is that the plan, the shop floor and procurement are one system, so the schedule reflects what is actually happening without anything being synchronised between tools.

Do we have to plan everything manually first?

No. Describe your workflow stages once and the system plans from your real orders. You can always reorder work by hand — the plan is a recommendation you control.

Which manufacturers is it suited to?

Project-based and made-to-order production: modular houses, furniture, metalwork, joinery and similar work, where every order passes through several stages and no two are identical.

How long before we see a working plan?

Most companies have their workflow described and a real project scheduled within the 14-day trial.